Q How long does the unit take to set up on site after being delivered
A Once power and water is supplied, the unit’s catchment tank only has to be filled and the filtration System primed. This only takes around one hour. Electrical and plumbing supply is normally done before the unit arrives.
Q How long does the unit take to fill with water
A 30 to 40 minutes
Q Do you have to fill the unit with water each day
A No
Q What is the set up time each day
A approx 15mins
Q What is the pack up time each day
A approx 15mins
Q Do you have to drain the system each day
A No
Q How much water does it use per car wash
A approx 3 litres per wash (evaporation top up)
Q How heavy is the unit
A approx 4 tonne
Q How long is the unit
A 7.5 meters
Q How wide is the unit when opened
A 5.4 meters
Q How much water is in the catchments tank
A approx 2000 litres
Q What power supply is required
A 25 amp 240 volt supply, direct wired
Q What water supply is required
A standard hose connection
Q How many people does it take to operate the unit
A Depending upon car turnover, usually from One to Three
Q What is the largest car that can go onto the unit
A 6 meters long, SWL 4 tonne
|